Five Forks Solar in Macon, NC

For the Five Forks Solar Farm, we started the project with mass grading and sediment basin excavation at the site, along with roadway installation to the site itself. After the panels were installed, we seeded the site, along with installing multiple erosion control measures. Finally, once everything was complete, we installed roadways throughout the solar farm.